OG&E Semiole Plant

Seminole Plant Facts:

A. 1977 Maximum Output-1625MW -1,625,000 KW -1,625,000,000 Watts -this is enough to light 16,250,000 100 Watt light bulbs.

B. Steam-Turbine-Genertor

  1. Manufacturer
    • No. 1 and No. 3 General Electric Co.
    • No. 2 Westinghouse Corp.
  2. Commercial Operation:
    • No. 1 -1971
    • No. 2 -1973
    • No. 3 -1975
  3. &127;Maximum Capacity:
    • #1 - 540 MW Gross 530 Net
    • #2 - 519 MW Gross1977 507 Net on the average now due to iron oxide fouling Air Preheater baskets - resulting in high furnance pressure.
  4. Installed Costs:
    • #1- $51 million
    • #2- $38 million
    • #3- $68 million
    • #1 Gas Turbine - $1.5 million
  5. Delivers power to system grid.
    • #1 to 138,000 volt distribution system.
    • #2 & #3 to 345,000 volt distribution system.
C. Boilers - Manufacturers by Babcock &Wilcox D. No. 1 Gas Turbine E. Seminole Lake- 1300 Acre Lake F. Employees

Seminole Generating Station, Units 1, 2, 3 and Gas Turbine